Xu, Yang-Tao
Zhang, Yu
Huang, Xue
Funding for this research was provided by:
The State Key Laboratory for Manufacturing Systems Engineering (sklms201306)
National Natural Science Foundation of China (11001181)
Program for Liaoning Excellent Talents in University (LJQ2011014)
This article is maintained by: Elsevier
Article Title: Single-machine ready times scheduling with group technology and proportional linear deterioration
Journal Title: Applied Mathematical Modelling
CrossRef DOI link to publisher maintained version: https://doi.org/10.1016/j.apm.2013.05.064
Content Type: article
Copyright: Copyright © 2013 Elsevier Inc. All rights reserved.