Determining a Reliability Centered Maintenance (RCM) analysis model for large diameter prestressed concrete water pipelines
Crossref DOI link: https://doi.org/10.30574/gjeta.2024.19.2.0047
Published Online: 2024-05-30
Update policy: https://doi.org/10.30574/gjeta.ourcrossmarkpolicy
James Geisbush,
Samuel T. Ariaratnam,