From planning to performance: MRP-driven material optimization for the bored pile construction of the MUI and Safa-Marwa towers in Indonesia
Crossref DOI link: https://doi.org/10.30574/wjarr.2025.26.3.2230
Published Online: 2025-06-30
Update policy: https://doi.org/10.30574/wjarr.ourcrossmarkpolicy
Manik Mahachandra,
Ariane Astri,