Investigation of the suitability of the borrow pit materials utilized for the construction of 9.5 km ring road three in Uyo local government area
Crossref DOI link: https://doi.org/10.30574/wjarr.2025.28.1.3526
Published Online: 2025-10-30
Update policy: https://doi.org/10.30574/wjarr.ourcrossmarkpolicy
Udoh, Peace Gilbert