ECONOMICALLY CONTROLLED RECONSTRUCTION: A METHODOLOGY OF PHASED REPAIR WITH SAFETY- AND BUDGET-BASED PRIORITIZATION
Crossref DOI link: https://doi.org/10.30574/wjarr.2026.31.3.2347
Published Online: 2026-09-30
Update policy: https://doi.org/10.30574/wjarr.ourcrossmarkpolicy
Voroshilo, Vladimir Vladimirovich