A Combined Method for Solving the Problem of Optimizing the Production Schedule of Metal Structure Processing for Use in a Cyber-Physical Control System of a Metallurgical Enterprise
Crossref DOI link: https://doi.org/10.1007/978-3-030-95120-7_21
Published Online: 2022-03-27
Published Print: 2022
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Bolshakov, Alexander A. https://orcid.org/0000-0001-7966-718X
Slobodyanyuk, Lilia
Shashikhina, Olga
Kovalchuk, Yana
Text and Data Mining valid from 2022-01-01
Version of Record valid from 2022-01-01
Chapter History
First Online: 27 March 2022