A simultaneous planning of production and scheduling operations in flexible flow shops: case study of tile industry
Crossref DOI link: https://doi.org/10.1007/s00170-016-8955-z
Published Online: 2016-06-01
Published Print: 2017-02
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Ramezanian, Reza
Fallah Sanami, Sahar
Shafiei Nikabadi, Mohsen
License valid from 2016-06-01