Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
Crossref DOI link: https://doi.org/10.1007/s00170-017-1429-0
Published Online: 2017-12-08
Published Print: 2018-04
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Azami, Aria
Demirli, Kudret http://orcid.org/0000-0002-3080-2464
Bhuiyan, Nadia
Funding for this research was provided by:
Natural Sciences and Engineering Research Council of Canada (CA) (CRDPJ 459185 – 13)
License valid from 2017-12-08