Estimation of the TBM penetration rate using the post-failure behavior of a rock mass and the equivalent thrust per cutter. A case study: the Amirkabir Water Transferring Tunnel of Iran
Crossref DOI link: https://doi.org/10.1007/s10064-017-1205-2
Published Online: 2017-12-02
Published Print: 2019-04
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Lazemi, H. A.
Soleiman Dehkordi, M.
Text and Data Mining valid from 2017-12-02
Article History
Received: 7 March 2017
Accepted: 9 November 2017
First Online: 2 December 2017