Yard crane scheduling to minimize total weighted vessel loading time in container terminals
Crossref DOI link: https://doi.org/10.1007/s10696-017-9299-1
Published Online: 2017-11-07
Published Print: 2017-12
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Huang, Shell Ying http://orcid.org/0000-0003-4255-6245
Li, Ya
Funding for this research was provided by:
Nanyang Technological University (RG45/12)
License valid from 2017-11-07