Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)
Crossref DOI link: https://doi.org/10.1007/s10696-018-9310-5
Published Online: 2018-03-17
Published Print: 2019-06
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Bhosale, K. C. http://orcid.org/0000-0002-9429-6572
Pawar, P. J.
Text and Data Mining valid from 2018-03-17
Article History
First Online: 17 March 2018