Field Test Optimization of Shield Tunnelling Parameters Undercrossing an Existing High-Speed Railway Tunnel: A Case Study
Crossref DOI link: https://doi.org/10.1007/s10706-020-01564-3
Published Online: 2020-09-16
Published Print: 2021-02
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Huang, Zhen
Zhang, Hai
Long, Zhen
Qiu, Wenge
Meng, Guowang
Zhu, Lianchen
Text and Data Mining valid from 2020-09-16
Version of Record valid from 2020-09-16
Article History
Received: 21 July 2020
Accepted: 7 September 2020
First Online: 16 September 2020