The Basic Results of Alignment and Summary of Operations of the Main K-1000-60/3000 Turbine Unit with a Small Number of Bearings at the Bushehr Nuclear Power Plant
Crossref DOI link: https://doi.org/10.1007/s10749-018-0897-1
Published Online: 2018-06-07
Published Print: 2018-03
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Lisyanskii, A. S.
Shklyarov, M. I.
Mironov, A. M.
Lebed’ko, N. S.
Text and Data Mining valid from 2018-03-01
Article History
First Online: 7 June 2018