Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method
Crossref DOI link: https://doi.org/10.1007/s11204-017-9476-y
Published Online: 2017-11-25
Published Print: 2017-11
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Li, Ya-dong
Cui, Jie
Mo, Hai-hong
Li, Wei
Yuan, Jie
License valid from 2017-11-01