Long-Term Generation Scheduling of Hydropower System Using Multi-Core Parallelization of Particle Swarm Optimization
Crossref DOI link: https://doi.org/10.1007/s11269-017-1662-1
Published Online: 2017-04-24
Published Print: 2017-07
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Liao, Sheng-li
Liu, Ben-xi
Cheng, Chun-tian
Li, Zhi-fu
Wu, Xin-yu
Funding for this research was provided by:
the National Natural Science Foundation of China (51209029)
License valid from 2017-04-24