Hill, B. C.
Giraldo-Londoño, O.
Paulino, G. H.
Buttlar, W. G.
Article History
Received: 4 February 2016
Accepted: 25 January 2017
First Online: 14 February 2017
Change Date: 1 June 2018
Change Type: Correction
Change Date: 1 June 2018
Change Type: Correction
Change Type: Correction
Change Type: Correction
Change Type: Correction
Change Details: The following correction should be noted: On page 642, in the seventh line of the third paragraph, the phrase “the Poisson’s Ratio is taken as v = 0.33” should be replaced with “the Poisson’s Ratio is taken as v = 0.25 for the asphalt mastic group and v = 0.16 for the aggregate group”.
Change Details: The following correction should be noted: On page 642, in the seventh line of the third paragraph, the phrase ?the Poisson?s Ratio is taken as v = 0.33? should be replaced with ?the Poisson?s Ratio is taken as v = 0.25 for the asphalt mastic group and v = 0.16 for the aggregate group?.
Change Date: 1 June 2018
Change Details: The following correction should be noted: On page 642, in the seventh line of the third paragraph, the phrase ?the Poisson?s Ratio is taken as v = 0.33? should be replaced with ?the Poisson?s Ratio is taken as v = 0.25 for the asphalt mastic group and v = 0.16 for the aggregate group?.
Change Details: The following correction should be noted: On page 642, in the seventh line of the third paragraph, the phrase ?the Poisson?s Ratio is taken as v = 0.33? should be replaced with ?the Poisson?s Ratio is taken as v = 0.25 for the asphalt mastic group and v = 0.16 for the aggregate group?.
Change Details: The following correction should be noted: On page 642, in the seventh line of the third paragraph, the phrase ���the Poisson���s Ratio is taken as v = 0.33��� should be replaced with ���the Poisson���s Ratio is taken as v = 0.25 for the asphalt mastic group and v = 0.16 for the aggregate group���.
Change Date: 1 June 2018
Change Date: 1 June 2018