Length optimization of straight line connecting turnout on main line in high-speed railway station yard
Crossref DOI link: https://doi.org/10.1007/s11771-017-3514-9
Published Online: 2017-06-09
Published Print: 2017-05
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Yin, Guo-dong
Shi, Jin
Wei, Qing-chao
Lai, Lin
License valid from 2017-05-01