Chung, Heeyoung
Lee, In-Mo
Jung, Jee-Hee
Park, Jeongjun
Article History
Received: 8 May 2018
Revised: 6 July 2018
Accepted: 14 July 2018
First Online: 30 November 2018
Change Date: 30 November 2018
Change Type: Erratum
Change Details: This erratum is published to notify an error of a reference which was cited in-text, but not mentioned in the references section. See revised reference below:<Emphasis Type="Bold">Errata:</Emphasis>Jung, J. H., Chung, H., Kwon, Y. S., and Lee, I. M. (2019). βAn ANN to predict ground condition ahead of tunnel face using TBM operational data.β <Emphasis Type="Italic">KSCE Journal of Civil Engineering</Emphasis>, Vol. 23, No. 7, pp. 3200β3206, DOI: <ExternalRef><RefSource>https://doi.org/10.1007/s12205-019-1460-9</RefSource><RefTarget Address="10.1007/s12205-019-1460-9" TargetType="DOI"/></ExternalRef>.The original article has been corrected.