Study on the simulation and optimization of the heat transfer scheme in a buried-pipe ground-source heat pump
Crossref DOI link: https://doi.org/10.1007/s12517-020-05511-7
Published Online: 2020-06-19
Published Print: 2020-07
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Du, Jingjing
Luo, Zujiang
Ge, Weiya
Funding for this research was provided by:
China geological survey Jiangsu coorperation project (12120114023101)
Text and Data Mining valid from 2020-06-19
Version of Record valid from 2020-06-19
Article History
Received: 28 May 2019
Accepted: 3 June 2020
First Online: 19 June 2020