A methodology for selecting the required cross-section of a self-supporting retaining bulkhead, on a vertical excavation front, of an energy conduit passage trench
Crossref DOI link: https://doi.org/10.1007/s12667-021-00429-9
Published Online: 2021-03-06
Published Print: 2021-11
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Zachos, Dimos https://orcid.org/0000-0003-3023-7757
Bakalis, Georgios
Bakalis, Konstantinos
Alamanis, Nikolaos
Papageorgiou, Grigorios
Xafoulis, Nikolaos
Text and Data Mining valid from 2021-03-06
Version of Record valid from 2021-03-06
Article History
Received: 3 January 2021
Accepted: 20 February 2021
First Online: 6 March 2021