Integrated scheduling of part and tool in a flexible manufacturing system using modified genetic algorithm
Crossref DOI link: https://doi.org/10.1007/s13198-017-0633-5
Published Online: 2017-05-27
Published Print: 2017-11
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Kumar, Naveen
Chandna, Pankaj
Joshi, Dheeraj
License valid from 2017-05-27