Determination of a safe mud window and analysis of wellbore stability to minimize drilling challenges and non-productive time
Crossref DOI link: https://doi.org/10.1007/s13202-015-0198-2
Published Online: 2015-09-04
Published Print: 2016-09
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Aslannezhad, Masoud
Khaksar manshad, Abbas
Jalalifar, Hossein
License valid from 2015-09-04