A method to reduce the uncertainty of pressure prediction in HPHT prospects: a case study of Onshore Niger Delta depobelt, Nigeria
Crossref DOI link: https://doi.org/10.1007/s13202-017-0401-8
Published Online: 2017-11-25
Published Print: 2018-06
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Asedegbega, J. E.
Oladunjoye, M. A.
Nwozor, K. K.
License valid from 2017-11-25