Investigation on Dielectric Failure of High Voltage Equipment in Substation Caused by Capacitor Bank Switching
Crossref DOI link: https://doi.org/10.1007/s42835-019-00093-1
Published Online: 2019-01-22
Published Print: 2019-03
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Srisongkram, Warunee
Fuangpian, Phanupong
Suwanasri, Thanapong
Suwanasri, Cattareeya
Text and Data Mining valid from 2019-01-22
Article History
Received: 18 May 2018
Revised: 1 December 2018
Accepted: 11 December 2018
First Online: 22 January 2019