Mouhaya, Abdelilah
El Hammoumi, Aboubakr
El Ghzizal, Abdelaziz
Motahhir, Saad
Article History
Received: 13 September 2025
Accepted: 28 November 2025
First Online: 8 December 2025
Declarations
:
: This study presents an assessment of the technical feasibility and economic viability of implementing a Floating Photovoltaic (FPV) system on the Al Wahda Dam, relying solely on modeling, simulation (using SAM software), and publicly available climatic and technical data. This research did not involve human participants, animal experimentation, or clinical trials. Therefore, formal ethical approval was not required for this study. As this study is a theoretical and technical assessment of infrastructure and does not involve any direct interaction with human subjects or participants, the requirement for obtaining informed consent to participate is not applicable.
: Not applicable.
: This study is not a clinical trial.
: The authors declare that they have no known competing financial interests or personal relationships that could have influenced the work reported in this study.