Heuristics for the Hybrid Flow Shop Scheduling Problem with Parallel Machines at the First Stage and Two Dedicated Machines at the Second Stage
Crossref DOI link: https://doi.org/10.1007/978-3-319-76348-4_67
Published Online: 2018-03-22
Published Print: 2018
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Nabli, Zouhour
Khalfallah, Soulef
Korbaa, Ouajdi
License valid from 2018-01-01