Two-machine open-shop scheduling with rejection to minimize the makespan
Crossref DOI link: https://doi.org/10.1007/s00291-015-0409-8
Published Online: 2015-07-15
Published Print: 2016-03
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Zhang, Liqi
Lu, Lingfa
Yuan, Jinjiang
Text and Data Mining valid from 2015-07-15