Impact of Overcut on Interaction Between Shield and Ground in the Tunneling with a Double-shield TBM
Crossref DOI link: https://doi.org/10.1007/s00603-015-0823-x
Published Online: 2015-08-23
Published Print: 2016-05
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Hasanpour, Rohola
Rostami, Jamal
Özçelik, Yılmaz
Funding for this research was provided by:
TÜBİTAK (MAG-114M568, MAG-114M568, MAG-114M568)
Text and Data Mining valid from 2015-08-23