Stability analysis and optimization of excavation method of double-arch tunnel with an extra-large span based on numerical investigation
Crossref DOI link: https://doi.org/10.1007/s11709-020-0710-8
Published Online: 2021-03-04
Published Print: 2021-02
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Xue, Yiguo
Gong, Huimin
Kong, Fanmeng
Yang, Weimin
Qiu, Daohong
Zhou, Binghua
Text and Data Mining valid from 2021-02-01
Version of Record valid from 2021-02-01
Article History
Received: 10 August 2019
Accepted: 23 January 2020
First Online: 4 March 2021