Prediction of face advance rate and determination of the operation efficiency in retreat longwall mining panel using rock engineering system
Crossref DOI link: https://doi.org/10.1007/s40789-019-0245-6
Published Online: 2019-04-10
Published Print: 2019-09
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Aghababaei, Sajjad
Jalalifar, Hossein
Saeedi, Gholamreza
Text and Data Mining valid from 2019-04-10
Article History
Received: 16 October 2018
Revised: 3 February 2019
Accepted: 18 March 2019
First Online: 10 April 2019