Shi, Shengzhi
Xin, Li
Huang, Chao
Han, Gangqi
XU, Zhaodong
Chen, Xinyu
Funding for this research was provided by:
China State Construction Engineering Corporation Limited (CSCEC-2023-Z-18)
China State Construction Engineering Corporation Limited (CSCEC-2023-Z-18)
China State Construction Engineering Corporation Limited (CSCEC-2023-Z-18)
China State Construction Engineering Corporation Limited (CSCEC-2023-Z-18)
China State Construction Engineering Corporation Limited (CSCEC-2023-Z-18)
China State Construction Engineering Corporation Limited (CSCEC-2023-Z-18)
Article History
Received: 12 February 2025
Accepted: 20 May 2025
First Online: 29 July 2025
Change Date: 19 September 2025
Change Type: Update
Change Details: The original online version of this Article was revised: The Funding information section was missing from this article and should have read 'This work was supported by the Science and Technology Research and Development Project of China State Construction Engineering Corporation Ltd.: “Research, Development and Industrial Application of New Building Seismic Isolation and Damping Products” (Project No. CSCEC-2023-Z-18); the Shaanxi Province Qinchuangyuan “Scientist + Engineer” Workforce Development Project (Project No. 2022KXJ-084); and the Research Project of China State Construction Engineering Corporation Ltd.: “Research, Development and Industrial Application of New Products for Strengthening Existing Building Structures” (Project No. CSCEC-2025-Z-22).' The original article has been corrected.
Declarations
:
: The authors declare no competing interests.