Design, construction and commissioning of a high-flow radon removal system for XENONnT
Crossref DOI link: https://doi.org/10.1140/epjc/s10052-022-11001-9
Published Online: 2022-12-07
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Murra, M.
Schulte, D.
Huhmann, C.
Weinheimer, C.
Funding for this research was provided by:
Bundesministerium für Bildung und Forschung (05A17PM2,05A20PM1)
Text and Data Mining valid from 2022-12-07
Version of Record valid from 2022-12-07
Article History
Received: 25 May 2022
Accepted: 4 November 2022
First Online: 7 December 2022