Refined analysis and construction parameter calculation for full-span erection of the continuous steel box girder bridge with long cantilevers
Crossref DOI link: https://doi.org/10.1631/jzus.A1900322
Published Online: 2020-04-17
Published Print: 2020-04
Update policy: https://doi.org/10.1007/springer_crossmark_policy
Wang, Jin-feng http://orcid.org/0000-0002-9099-818X
Wu, Tian-mei
Zhang, Jiang-tao
Xiang, Hua-wei
Xu, Rong-qiao
Text and Data Mining valid from 2020-04-01
Version of Record valid from 2020-04-01
Article History
Received: 9 July 2019
Accepted: 3 January 2020
First Online: 17 April 2020