Minimization of Utilization Time for Specially Structured n × 3 Scheduling Model with Jobs in a String of Disjoint Job Blocks
Crossref DOI link: https://doi.org/10.35940/ijitee.L2629.1081219
Published Online: 2019-10-30
Update policy: https://doi.org/10.35940/beiesp.crossmarkpolicy
,
Bishnoi*, Pradeep
Gupta, Dr. Deepak
Bala, Dr. Shashi