Dynamic Performance of High-Speed Rail Cable Stayed Bridge with Altered Track Assembly
Crossref DOI link: https://doi.org/10.35940/ijrte.E4994.018520
Published Online: 2020-01-30
Update policy: https://doi.org/10.35940/beiesp.crossmarkpolicy
,
Variyavwala*, Jigar P.
Desai, Dr. Atul K.